New construction ductwork & air handler
New Construction · Ductwork · Greater Philadelphia



The project
A full HVAC rough-in at a new construction build: trunk and branch ductwork run through metal stud framing, insulated and sealed before the walls closed up, with the air handler set and connected.
What we did
Our crew fabricated and hung the duct trunk, ran branch ducts to every room, insulated and sealed the system, and set the air handler — all coordinated with the other trades so drywall could move in right behind us. The video above is a single continuous walkthrough of the rough-in, shot by our crew.
Questions builders ask about jobs like this
When should HVAC rough-in happen in a new build?
After framing and roof dry-in, before insulation and drywall — that's when duct runs, line sets and vents can be placed cleanly. We coordinate directly with your GC's schedule.
Do you coordinate with the builder?
Yes — we work from the plans, attend inspections and return for equipment set and startup.